- Browse Categories
- ASA Synthetic Resin Roof Tile (70)
- PVC Roof Sheet (97)
- ZXC PVC Plastic Roofing Sheet (30)
- ZXC UPVC Plastic Roofing Sheet (27)
- ZXC APVC Plastic Roofing Sheet (12)
- ZXC ASA -PVC Plastic Roofing Sheet (4)
- ZXC PVC Wall Sheet (4)
- ZXC ASA -PVC Wall Sheet (4)
- ZXC PVC Translucent Roofing Sheet (4)
- ZXC PVC Rain Water Gutter (5)
- ZXC PVC Flat Sheet (7)
- FRP Roofing Tiles (30)
- PC Roofing Tiles (25)
- PVC Gutter And Accessories (19)
- Contact us
- Address:Xiebian Industry Park, Danzao Town, Nanhai District,Foshan City,Guangdong Province,China
Worktime:8:00-18:00(Beijing time)
Business Phone:
86-757-81848277 +8613702632466
Fax:86-757-81848277Contact Now
ZXC made to measure pvc gutter
- Type:Other Plastic Building Materials
- Place of Origin:Guangdong, China (Mainland)
- Brand Name:ZXC
- Model Number:gutter
- Color:Blue,white
- Length:6m
- material:pvc
- Thickness:0.5mm- 3.0mm
1. PVC double-color coextrusion, color never fade |
2. High temperature resistance, anti-aging, anti-oxidant, acid- base mold erosion resistance, oxida |
3. Easy to cut and install |
4. Ethylene polymer material, leed-free, good UV performance |
5. Recyclable |
1.Q: What is your product line?
A: We specialize in PVC trunking, PVC pipe, PPR pipe and fittings.
2.Q: Are you a manufacturer?
A: Yes, We are a factory located in Foshan City, Nanhai District, Danzao Town, Hengjiang New Road.
More than 10 years of industry experience.
3.Q: If I want to get a quote, what information should I notify?
Answer:
(1) Product size (width x height x length, thickness).
(2) Color.
(3) Quantity.
4.Q: Can we print our logo or company name on your product or packaging?
A: Yes, you can.
5.Q: What is the payment term?
A: We accept T/T or L/C, as well as the top 30% deposits of T/T, Western Uion,
6.Q: Is the sample free?
A: We can send samples within 5 days, but the shipping cost needs to be paid by you.
When we have a formal order, its cost will rebound.
7.Q: How to control your quality?
A: We strictly select high quality raw materials and regularly check quality control during production.
8.Q: How long should your delivery date be?
A: Usually 15 days after receiving the deposit, it also depends on your product and quantity.
Certificate